This guide explains how long aircon installation typically takes, what makes a job quick or slow, how multi-unit and cassette installations differ, and how to prepare so the day goes smoothly. It is a companion to our split unit installation guide, which covers the installation process in detail. For a time estimate on your own job, request a free quote.
The short answer
A straightforward single split unit installation — indoor unit on an external wall, outdoor unit nearby, short piping run, existing suitable power point — is typically completed in a few hours. That is the common case, and it is what most homeowners should expect for a simple bedroom or lounge install.
More complex jobs take longer. A long piping run, work at height, piping through a tiled or pitched roof, a dedicated electrical circuit, an old unit to remove, or multiple units in one visit all add time. A complex single-unit installation can run to most of a day, and a multi-unit job can take a full day or more depending on how many units and how straightforward each one is.
These are general timeframes, not guarantees — the actual time depends on the specifics of your property, which is why a site assessment is part of a proper quote. A good installer gives you a realistic estimate up front so you can plan.
What makes an installation quick
A fast installation is a straightforward one, where every factor lines up in the installer’s favour. The hallmarks of a quick job are:
- A short piping run — the indoor and outdoor units are close together, often on the same wall, so the copper pipe, cable and drain are short and easy to route.
- An external wall for the indoor unit — the piping goes straight out through the wall behind the unit, with no long internal runs.
- A clear, accessible outdoor location — a slab, stand or wall bracket right below or alongside the indoor unit, with room to work.
- An existing suitable power point — an isolator or circuit nearby that can serve the unit without new cabling back to the board.
- Standard wall construction — brick or block that drills cleanly, no tiled or pitched roof to work through.
- A clear, prepared room — furniture moved back, access cleared, no obstacles to work around.
When these line up, a single split installation is a clean, half-day job. The installer arrives, assesses, mounts the indoor unit, drills the penetration, runs the lines, mounts the outdoor unit, makes the connections, vacuums the lines, commissions the system, and hands over. A few hours, start to finish.
What makes an installation take longer
Complications add time, sometimes a lot. The common factors that extend an installation are:
- A long piping run — when the outdoor unit has to go some distance from the indoor unit, more copper, cable and drain have to be routed, often through walls, ceilings or trunking.
- Work at height — outdoor units on upper floors, or indoor units that need ladders or scaffolding, take longer to mount safely.
- Piping through a tiled or pitched roof — routing lines through a roof is slower and more careful work than a straight wall penetration.
- Piping concealment — hiding lines in the wall or in trunking for a neat finish takes longer than a surface run.
- Electrical work — adding an isolator, running a new circuit back to the board, or upgrading the board to support the unit all add time.
- Removing an old unit — taking down and safely disposing of an existing unit and its piping adds time before the new install begins.
- Core drilling through hard materials — reinforced concrete or hard brick slows the wall penetration.
- Multiple units — each additional unit adds its own assessment, mounting, piping, connection and commissioning time.
None of these are problems — they are normal parts of many installations — but they do extend the time. A complex single-unit job can take most of a day, and a multi-unit job can run to a full day or more. A thorough installer factors these into the quote and the schedule, and tells you what to expect.
How long for multiple units?
Installing multiple units in one visit is more efficient per unit than separate visits, because the travel, setup and assessment are shared. Two units in one visit usually take less time than two separate visits — but it is still roughly double the work of a single unit, so plan for a longer day.
A typical two-unit installation — say a bedroom and a lounge, both reasonably straightforward — might take most of a day. Three or more units, or units with complications, can run to a full day or spread across two visits. The advantage of a single visit is efficiency and a single disruption; the trade-off is a longer day for you and the installer.
If you are planning to air-condition several rooms, it is usually worth doing them together rather than one at a time — it is more efficient, often more cost-effective per unit, and means one disruption rather than several. Mention all the rooms you are considering when you request a quote, so the installer can plan the visit and the sequencing.
How long for a ceiling cassette?
A ceiling cassette installation takes longer than a wall-mounted split, because it involves ceiling work. The indoor unit sits in a suspended or dropped ceiling, which means cutting a ceiling opening, supporting the unit above the ceiling, routing piping and drain through the ceiling cavity, and finishing the ceiling around the unit. The outdoor unit work is similar to a split, but the indoor side is more involved.
Expect a cassette installation to take longer than an equivalent wall split — often most of a day for a single unit, depending on the ceiling and the piping run. If a suspended ceiling does not already exist, the work to create one adds significantly to the time and the cost, which is why cassettes suit spaces that already have a ceiling cavity. See wall-mounted vs ceiling cassette aircon: which is best? for when each makes sense.
The stages of an installation and their time
Breaking the installation into its stages helps you see where the time goes, and why a thorough job takes as long as it does.
- Arrival and assessment — the installer confirms the placement, checks the wall and the electrical, and plans the piping run. A short stage, but it sets up everything that follows.
- Mounting the indoor unit — fixing the mounting plate level and secure, then hanging the unit. Faster on a clean wall, slower if obstacles are in the way.
- Drilling the wall penetration — a hole through the wall for the piping, cabling and drain, angled for condensate flow. Fast in soft brick, slower in concrete.
- Running the piping, cable and drain — connecting indoor to outdoor, concealed where possible. Time scales with the length and complexity of the run.
- Mounting the outdoor unit — on a bracket, stand or slab, level and secure. Faster with clear access, slower at height or in tight spaces.
- Connecting and flaring the refrigerant lines — joining the copper to the units with leak-free flared fittings. Careful work that should not be rushed.
- Vacuuming the refrigerant lines — using a vacuum pump to remove air and moisture before releasing refrigerant. This stage should not be skipped or shortened; it takes the time it takes.
- Electrical connection — wiring to the isolator and circuit protection. Longer if new cabling or a board upgrade is needed.
- Testing and commissioning — running the unit, checking pressures and temperatures, confirming cooling and drainage, and the handover. A thorough stage that protects the long-term result.
A rushed installer compresses these stages; a thorough one gives each the time it needs. The vacuuming and commissioning stages in particular are where shortcuts cause early failures — a unit installed without proper vacuuming may cool at first but fail early, and a unit that is not commissioned may have a blocked drain or a low refrigerant charge that goes unnoticed until it becomes a problem.
How to prepare so the day goes smoothly
Your preparation has a real effect on how smoothly and quickly the installation goes. A prepared site lets the installer work efficiently; an unprepared one adds time and risk.
- Clear the room — move furniture, pictures and curtains away from the wall where the indoor unit will go, and clear a path to it.
- Clear outdoor access — make sure the installer can reach the outdoor unit location with tools and a ladder, from inside and outside.
- Make the electrical board accessible — the installer may need to work at the board for the electrical connection.
- Protect floors and surfaces — drilling and piping create dust; a drop sheet near the work area helps.
- Arrange access — parking, gate codes, estate clearance if you live in a complex, and someone to receive the installer.
- Confirm the placement in advance — agree where the indoor and outdoor units will go before the day, so there is no on-the-spot deliberation.
- Be available for the handover — at the end, the installer should walk you through operation and maintenance; being there ensures it happens.
A clear, prepared site can take meaningful time off the job, because the installer works without interruption. It also protects your home from dust and damage, and it makes the handover smoother. A few minutes of preparation is well worth it.
What happens after the installation
Once the unit is commissioned and handed over, the installation is complete — but the first hours and days matter. Watch for steady cooling to setpoint, no water dripping down the indoor wall (a sign of a drain issue), and no unusual noises. A small “new unit” smell for the first hour is normal; persistent smells or noises are not, and should be raised with the installer.
Keep the indoor filters clean — a clogged filter is the most common cause of poor cooling and is easy to avoid. Have the unit serviced at the recommended interval to check refrigerant, clean the coils, and catch small issues early. See our care plans for routine maintenance options. A well-installed, well-maintained unit runs quietly and efficiently for many years.
What can delay an installation
Even a well-planned installation can run into delays, and knowing them in advance helps you avoid the most common ones. Most delays fall into a few categories, and most are preventable with a bit of preparation and a thorough site assessment.
Access delays are the most common. If the installer cannot park close to the property, cannot get a ladder to the outdoor unit location, or needs estate clearance that has not been arranged, the job stalls before it starts. In townhouse complexes and security estates, confirm gate access, visitor clearance and any work-hour restrictions ahead of the day. A short call to the estate office or body corporate the day before prevents a wasted morning.
Electrical surprises are the second category. An older home may have a board that cannot accept the new circuit, or wiring that needs upgrading before the unit can be connected safely. A thorough installer checks the board during the quote visit, not on installation day, so any electrical work is planned and quoted in advance rather than discovered mid-job. If your home is older, ask specifically whether the board will need work.
Structural surprises are the third. A wall that turns out to be reinforced concrete slows the drilling significantly; a tiled roof that looked accessible from below may need careful handling from above; a cavity that was meant to conceal piping may turn out to be too shallow. These are normal complications of real buildings, and an experienced installer anticipates most of them — but they do add time when they arise.
Finally, weather can delay outdoor work. Heavy rain makes roof and outdoor unit work unsafe, and a responsible installer will reschedule rather than risk a slip or a wet electrical connection. This is rare on the Highveld but does happen in summer. A good installer communicates early if weather is likely to affect the day, so you are not left waiting.
The bottom line
A straightforward single split installation typically takes a few hours; a complex one can take most of a day; multi-unit and cassette jobs take longer still. The time depends on the piping run, the wall and ceiling conditions, the electrical work, whether an old unit is removed, and how many units are installed. A thorough installer gives every stage — especially vacuuming and commissioning — the time it needs, and gives you a realistic estimate up front.
Prepare the site, confirm the placement in advance, and be available for the handover. And remember our price promise: bring us any comparable written quote from another aircon company in Gauteng and we will do our best to beat it.
Want a time estimate for your installation? Request a free quote — tell us the room, the wall and how many units you are considering, and we will give you a realistic timeframe alongside the price.